Getting the best results of your Full-Track Power Trowel

Getting the most as of your FULL-TRACK Power Trowel

Finishing concrete has continually been about timing: being in the precise place at the right time with the proper device. Good power troweling techniques are essential since floor uniformity is dependent directly on a finisher’s capacity to run trowel machines.

The right instrument and time

The reasons of power floating are: to embed the considerable aggregate just beneath the surface of mortar

To eradicate slight imperfections, humps, or voids to compact the concrete and consolidate mortar at the surface in preparation for further finishing operations. As I mentioned, timing is everything in finishing. The rule of thumb when to power float a floor is that your footprint should be 1/4 inch deep or less, with little or no bleed water at hand. Most floors that result in low F-numbers are the direct outcome of finishers receiving on a floor extremely premature with power trowels and making lumps and bumps. Remember, this is the most plastic state that the floor will exist in during a power floating progression. Timing is everything — poor timing causes finishing troubles. Additionally bear in mind that any finishing operation done while there is excess dampness or bleed water on the surface can cause dusting or scaling.

Choosing a walk-behind trowel

When choosing a walk-behind power trowel, you should be concerned about square footage/meterage, quantity of floor penetrations, concrete temperature, air temperature, wind, and comparative humidity, along with mix design. Here are the suggested uses for a variety of kinds of walk-behind trowels:

Full-Track rotor trowel (32-inch diameter): used mostly on edges, patios, basements, and driveways, small pours.

Full-Track rotor power trowel (36-inch diameter): used on small to medium pours, all types of floors.

Full-Track rotor power trowel (48-inch diameter): used on average to big pours, all types of floors.

Full-Track 2 rotor power trowel (Ride-on 36-inch diameter): used on medium to significant pours all kinds of floors; Floating Blades suggested

Using float blades with walk- behind trowels is at this moment an accepted practice because float blades can improve floor uniformity dramatically by eradicating surface imperfections and by improving the consolidation and compaction of the concrete surface. Float blades are used on the majority of flooring when a high spec floor is necessary. When using float blades:

Make a smallest amount of two passes

Make each pass perpendicular to the earlier pass

The more float blade passes, the flatter the floor

Run a pattern—don’t wander all over the floor

After the last float pass on a floor, instantaneously begin the initial troweling cycle at 90 degrees to the previous pass. For this transition—floating to troweling—combination blades are incredibly helpful. Be sure to run the blades of the troweling machine flat or with a very trivial pitch on the first pass (and at a slow speed). Each additional troweling pass raises the compaction of the fines at the surface and decreases the water cementitious materials ratio of the concrete near the slab surface. The trowel blades agitate surface paste and hasten the evaporation rate of water inside the paste.

With each successive pass, increase the blades of the troweling machine to enable the finisher to apply sufficient pressure for proper finishing. Chatter marks on a floor are a result of the blades being raised extremely high, too premature, or too quick for floor conditions.

For the finest results, the high performance ride-on trowels are the most powerful on the market plus are used on as rule considerable commercial projects. These riders produce good horsepower-to-weight ratios and will offer superior finishes.

Posted in Uncategorized | Leave a comment

Into the Future with FULL-TRACK Concrete Polishing

Into the Future with FULL-TRACK Concrete Polishing

Everyone is familiar with concrete. Anyone has seen concrete in streets, sidewalks and buildings. In this developed time, people see concrete so often, they would much rather look at something else. The foundation of the urban jungle has become mundane and unappealing.

And yet, concrete has always been linked to progress.

The secret of making concrete itself was lost until the 18th century, and advancements since then have not focused on the aesthetics that it may have had. Concrete progressed, but its beauty did not.

But the last two decades has seen the return of concrete to exclusivity and progress. With the advent of FULL-TRACK Concrete Polishing, more and more businesses and homes begin to employ this advancement in their flooring, and why not? Concrete Polishing is simply the better choice; it is more cost-effective than tiling, it’s easier to clean, and both its shine and material last longer than others on the market.

FULL-TRACK Concrete Polishing is the future of concrete. If you find concrete unappealing, wait until you see how sleek the polished finished is. You can even enhance it with color, or add certain aggregates to further enhance the beauty of your floor. Most homes have a concrete foundation, so FULL-TRACK Concrete Polishing is the natural way to go for many who seek to renovate their homes.

Find a FULL-TRACK contractor now! Get that concrete floor polished and bring your home into the future!

Posted in Uncategorized | Leave a comment

With tight margins

With tight margins

 

With margins tight in today’s economy, its imperative your equipment is well taken care of and running at the maximum of productivity. When your finishing trowel is running the way it should, you’ll see fuel efficiency and a safe, reliable machine that keeps on running at the jobsite.

A smooth FULL-TRACK finish
Since the purpose of a FULL-TRACK trowel is to flatten a floor, failing to properly maintain your FULL-TRACK trowel will negatively affect a floor’s finish. A FULL-TRACK trowel with a poorly maintained engine might sputter or jerk on the slab, resulting in dents on the floor, commonly referred to in the industry as “furrows.” In addition, inability to properly pitch your blades, a bent arm or spider, or a worn out blade can cause a swirling pattern on the floor.

Grease, oil and fuel leaks will also negatively affect the finish. “Troweling begins after most of the bleed water from the slab has evaporated. If oil gets on the slab, it’s going to cause problems on the top. The remaining bleed water will evaporate and leave the oil on the slab, creating a finish problem.”

Cleanliness is also important in achieving a smooth finish. “A poorly maintained FULL-TRACK trowel that isn’t clean is going to drop dry concrete on the floor and scratch the polished surface on those last few passes. There is no way to go back and repair that damage.

Routine maintenance
Check with your trowel manufacturers maintenance guidelines to determine the best maintenance intervals for your FULL-TRACK’s trowel utilization.

Posted in Uncategorized | Leave a comment

The 40 Most Asked Questions about F-Numbers

The 40 Most Asked Questions about F-Numbers

1. What are F-Numbers? 

The F-Number System is the American Concrete Institute (ACI 117) and Canadian Standards Association (CSA A23.1) standard for the specification and measurement of concrete floor flatness and levelness.  F-Numbers replace the familiar “1/8th inch in ten feet” type specs that had proven unreliable, unmeasureable and unrealistic. 

        The new standards include two F-Numbers: 
                                FF  for flatness and FL for levelness   

Flatness relates to the bumpiness of the floor, while levelness describes the local tilt or pitch of the slab. The higher the F-Number, the better that characteristic of the floor. F-Numbers are linear, so an F20 is twice as flat as an FF 10, but only half as flat as an FF 40. 
Slabs-on-grade are usually specified with an FF number and an FL number (the FF is always listed first), such as : 

                                                FF 25 / FL20 

Because of deflection, elevated slabs are usually specified using only FF.  

When a floor is described as an “F 25″, it usually means “FF 25″. 
The ACI/CSA F-Number System applies to 99% of all floor slabs – all floors that support random traffic, be it vehicular or pedestrian traffic. 

In the tiny percentage of floors that have defined traffic, where vehicles are restricted in their movement by wire or rail guidance, a different F-Number – Fmin - is used. This System is used in conjunction with consultation services provided by The Face Companies. 

Most Superflat floors should use the Fmin System, since most of these slabs support defined traffic. 

2. What was wrong with the old “straightedge” specs?  

There was disagreement as to what they meant.   
Did “1/8th inch in ten feet” mean ± 1/8″ in 10′ (a horizontal 1/4″ envelope which is 10′ long) – or – did it mean ± 1/16″ in 10′ (a horizontal 1/8th inch envelope which is ten feet long)? 

Straightedge measurements were unscientific and non-repeatable.   
Before F-Numbers, floors were only “measured” long after the fact, when someone didn’t like the floors’ general appearance. That’s when the straightedge was finally hauled out by the aggrieved party in an effort to prove his case. Of course, no two people got the same results, since there was no standard for either the test method or for interpreting the results. 

They were unrealistic. 
Although “1/8th inch in ten feet” has been used to specify billions of square feet of concrete, it was seldom, if ever, achieved. The typical industrial floor, for example, is closer to a horizontal 5/8th inch by ten foot envelope. 

3. If floor measurements are so inaccurate, how can you determine floor flatness at all? 

During the last 25 years, extremely accurate floor measuring instruments have been developed.  
One, the Profileograph, produces continuous measurements of wheeltrack areas along designated vehicular travel paths.  The Profileograph is used only on Defined Traffic Floors. 

Another instrument, the Dipstick Floor Profiler, produces a point-to-point graph of the surface measured, as well as the data required to compute ACI/CSA F-Numbers forRandom Traffic Floors. 

4. Now that you can make accurate measurements, why can’t we keep using the straightedge specs? 
  
Straightedge specifications didn’t control the characteristics of the floor that relate to its usefulness.   

For instance, all of these floor profiles would satisfy the “1/8th inch in ten feet spec”:  

Since all these floor profiles would meet the 1/8th” spec, the straightedge specs themselves simply were not capable of controlling the floor profile.  

5. How are F-Numbers better? 

F-Numbers control both the floor’s “envelope” and its bumpiness. 
Or, if you think of the floor profile as a wave, F-Numbers control both the wave’s amplitude and its frequency. 
F-Numbers have shown the ability to identify and to control floor characteristics which are critical to the floor’s usefulness.  

6. What F-Number equals 1/8th” in 10′? 

For all of the reasons outlined already, there is no F-Number equivalent to any straightedge spec. But, rough equivalents, in terms of horizontal envelopes, can be given: 
        An FF 25 is roughly equivalent to a single ± 1/4″ defect in 10′ 
        An FF 50 is roughly equivalent to a single ± 1/8″ defect in 10′ 
        An FF 100 is roughly equivalent to a single ± 1/16″ defect in 10′ 

7.  Since I’ve been meeting 1/8th” in 10 ‘ for years, why should I have any problem meeting an FF 50 ? 

Because you weren’t meeting 1/8th inch in 10 feet! Just because the floor was accepted and paid for doesn’t mean it was actually that flatThe only time you can be sure you actually built a floor to a specific tolerance is if the floor was measured.   
In all probability, most of the concrete floors placed in the last 50 years would measure somewhere between FF 15 and FF 35; that’s something like horizontal envelopes measuring 1 inch by 10 feet – to 3/8ths inch by 10 feet. 

8. How can I find out what F-Numbers I have been producing ? 

Just hire a testing lab to measure some of your old jobs. If your local test lab doesn’t have a Dipstick, you can rent or purchase one and measure the floors yourself.  Then, you will know exactly what F-Numbers you have been able to produce under the particular circumstances of each project you measured. 

9. I don’t need floors that are very flat, so why should I worry about F-Numbers? 

Using F-Numbers doesn’t mean that floors have to be specified flatter than is needed. But, without F-Numbers, there is no way to measure reliably what floor flatness/levelness was actually produced. 
    The average industrial floor is about an FF 20-25 / FL 15-20. Many building owners are satisfied with this result, but some would find areas of the floor that they would want “fixed”. 
What happens if the floor profile is not specified at all, and an FF 12 / FL 8 is produced? Most owners are not going to be happy with this result.   
But without clearly defining what is and is not satisfactory in the floor specification, the developer of the building has no control whatsoever over what he is buying. 

10. What good does it do to measure a floor after it’s already in place … isn’t it already too late? 

F-Numbers were not invented as a way to find somebody to blame.   Properly used, F-Numbers identify problems and help prevent their recurrence.   
    After gaining experience with F-Numbers, a contractor can select placement and finishing procedures which will make a failure very unlikely. 
F-Number measurements should be taken as soon as each day’s placement will bear foot traffic. In most cases, the F-Numbers for that slab can be determined within an hour or two and a report generated before the next slab is placed. 
With daily measurement, a construction problem can be identified and corrected before it’s repeated.  

  
11. That’s great for the second placement, but what do you do to make sure the first pour is okay? 

Placing floors to achieve certain F-Numbers is not guesswork.  
    Millions and millions of square feet of concrete have been placed using the F- Number System. Concrete contractors have learned that, by using certain placement and finishing techniques, they can routinely achieve different F-Numbers (see Measuring the Quality of Floor Finishes). 
    Therefore, if a job is specified FF 25 / FL20, a contractor should use procedures which typically produce those F- Numbers or, to play it safe, methods which produce marginally higher F-Numbers. 

So, the keys to meeting F-Numbers specs are:  
    1. Choose the correct placement and finishing procedures to meet the specified F- Numbers.  
    2. Measure each day’s work as soon as possible so, if there’s a problem, it will be identified before it’s repeated.  

  
12. How does a novice know what F-Numbers to specify?  

There are two ways to select the proper F-Numbers for a given floor usage.  
    The first and the best way is to identify a floor in a building that the user is already happy with. The F-Numbers for this floor can then be measured and used to develop a new floor specification.  
    
If that’s not practical, you can use F-Numbers suggested by the American Concrete Institute and others, which are based on hundreds of projects around the country.  

13. How are F-Numbers measured? 

F-Numbers are derived from a statistical analysis of the floor’s elevation measured at one-foot intervals. The elevation differences over two feet are used to determine FF , while the differences over ten feet are used to determine FL.  
Basically, measurement lines are laid out on the floor, and elevation measurements are taken every one foot down the line. Each measurement line should be at least 11 feet long, and at least 34 individual elevation measurements should be taken for each 1,000 square feet of floor area.   Detailed rules for performing F-Number tests are set forth in ASTM E-1155. 
After collection, the elevation readings are put into standard mathematical formulae to calculate the floor’s F-Numbers.   Several devices are approved by ASTM for F-Number measurement, including the Dipstick Floor Profiler.  

  
14. How long does it take to measure a floor? 

A single operator with a Dipstick can collect enough readings in 60 to 90 minutes to measure the typical day’s slab-on-grade placement.  With the Dipstick® 2000, 2200, or 2272, the data can then be analyzed right on the Dipstick®.  Alternatively, the data may be downloaded to a PC at your office for analysis later. 

  
15. What if the floor doesn’t meet the specified F-Numbers? 

This is a question that must be answered before the construction of the floor begins.   The “what-if’s” should always be addressed in the floor specification.  Each floor should be specified using two pairs of F-Numbers called:    

    Specified Overall F-Numbers and

     Minimum Local F-Numbers.  
The Specified Overall F-Numbers represent the minimum values allowed for the entire floor, looked at as a whole. 
The Minimum Local F-Numbers define the minimum quality acceptable to the Owner – the lowest results allowed in any one floor section.  These numbers are generally set at about 2/3 of the Specified Overall Numbers.  This allows contractors sufficient margin for the normal variations that occur with a given construction method.   However, no floor should be spec’ed with Minimum Local values lower than FF 13 / FL 10; this is the worst result to be tolerated from any construction technique.  
The idea is that if the Contractor aims above the Overall F-Numbers, he will, at least, average those Overall values – and it is very unlikely that he will fail to achieve theMinimum Local F-Numbers. 

  
16. That makes the odds better, but say the Contractor does miss the Minimum Local F-Numbers? 

As we’ve pointed out, the Minimum Local F-Numbers give the Contractor very considerable room for error, but if he does miss even these lower numbers, he has only two choices: 
    1) Repair (this almost always means re-topping) all defective sections. 
    2) Remove and replace all defective sections. 
But don’t worry too much about ripping out slabs right and left.  If the proper procedures are used, the chances of failing to meet Minimum Local F- Numbers on a project are almost zero.  

17. What about localized grinding as a repair? 

Because F-Numbers are a statistical measurement, localized grinding usually doesn’t work on Random Traffic Floors.   If the grinding removes what looks like a “bump” in one direction, the grinding might be creating a “dip” when the floor is measured in another direction. 
Unless there is a very obvious local defect, grinding is not a solution.  

18. What happens if the Specified Overall F-Numbers are missed? 

Because the specification has already defined the Minimum Local F-Numbers as “acceptable”, no corrections are mandated by failing to satisfy the Specified Overall F-Numbers.  But clearly, the floor produced was not the floor specified. The Face Companies’ recommended solution is a rebate formula. The floor specification should include a per-square-foot figure for the number of square feet that does not meet the Specified Overall F-Numbers.  

  
19. How can you figure out how much of the floor fails to meet the Specified Overall F-Numbers? 

The software which comes with every model of the Dipstick automatically calculates the floor area equal to spec, the floor area better than spec, and the floor area worse than the spec. 

  
20. Does this mean I have to buy a Dipstick to put in a floor specified with F-Numbers? 

The Dipstick offers the fastest, easiest and most economical way to monitor F-Number projects, but, in most cases, purchase of a Dipstick in order to measure a single project is neither necessary nor advisable. 
Many testing labs already have Dipsticks and offer F-Number measurement as part of their overall quality control services. 
Dipsticks are also available for rent – by the week or the month. 

21. Can anyone operate a Dipstick? 

People who have never run a Dipstick should receive one or two days of training in the operation of the instrument and in F-Number measurement procedures. 
This training and Dipstick certification are offered by The Face Companies. 
Official ACI, CSA and ASTM documents should always be kept available for quick reference on jobsite. 

  
22. Is it okay if F-Number measurements are taken less frequently – maybe even just at the end of the job? 

The ACI mandates F-Number measurement within 72 hours of slab installation (this would allow a Friday pour to be measured on Monday). On most projects, daily testing is best. 
A significant delay between placement and measurement can allow shrinkage or deflection phenomena (such as curling) to affect the results.   One of the objectives of timely measurement is to establish clearly whether the Contractor did or did not do his job, so that the cause and remedy of any problems found can be easily determined. 

23. How can I improve the F-Numbers I get? 

There are many factors which influence F-Number results, but there is a simple way to look at it: 
                    FF = finishing     FL = forming & strike-off 

The quickest, easiest and least expensive way to improve flatness (FF) is to replace the bullfloat with a Full-track machine. At no extra cost, this simple equipment substitution alone can result in an increase of 25% to 50% in the resulting FF numbers. 
By increasing the number of highway straightedging operations during the finishing process (after floating, refloating, etc.), higher and higher FF numbers can be achieved. The distance between edge forms may have to be reduced below 25 feet to achieve FF numbers above 40. 
The accuracy in setting forms and the accuracy of the strike-off operation have the greatest impact on levelness (FL).   
Because of the increased number and intensity of operations, more labor is generally required to achieve higher and higher F-Numbers. 

24. Why is flatness important on elevated slabs? 

While its cosmetic importance is obvious, slab flatness/levelness also has a major impact on the ease, efficiency and cost of finishing out tenant spaces. The construction and installation of door frames, movable partitions, pre-fabricated cabinetry and elevator landings are impacted by the flatness and levelness of the floor slabs. 

  
25. How do F-Numbers work on elevated slabs? 

In most cases, only the FF number is specified on elevated slabs. That’s because elevated slabs deflect – and the contractor can’t totally control how much deflection occurs.   The use of FL on elevated slabs is limited to specific situations where the floor profile is analyzed when : 
  
        
a) the slab is still supported in its original as-cast position; and 
        b) the slab has no camber. 

26. What FF Numbers should be specified for elevated slabs? 
  
An Overall FF 25 is well received by most Owners and can be achieved without significant cost burden. The Face Companies recommend that no elevated slab should be specified lower than Overall FF 20.  The right FF for each job will depend on the use of the floor. For instance, a floor that will be tiled should be flatter than a floor that will be carpeted. 

  
27. Even though Fshouldn’t be used on most elevated slabs because of deflection, isn’t controlling deflection still important? 
   
Yes. Although F-Numbers aren’t the answer for controlling deflection, the Dipstick can be used to produce floor profiles before and after shore removal. By studying the amount of deflection which occurs, design and construction procedures can be modified until optimum results are achieved. 

28. Without an F-Number for deflection, how is it specified and controlled? 

The Face Companies recommend that the elevated slab specification require that a certain percentage of the elevation points measured using ASTM procedures after deflection has occurred fall within a defined envelope. 

Based on Face Companies research, most Owners are happy with the result if 80% of the sample falls within a 3/4 inch envelope.  
During measurement and data analysis, each measurement line is tied to a design elevation to make this analysis possible. 

29. How long does it take to measure an elevated slab? 

In order to perform the deflection analysis unique to elevated slabs, extra care is taken to identify each measurement line before readings are taken. 
This means that elevated slabs take a little more time to measure. 
Generally, 20,000 to 25,000 sq. ft. of elevated slabs can be measured in two to two and a half hours. 

30. How are defects in elevated slabs repaired? 

The most common repair method is patching (or “skim-coating”). Floor locations identified by Dipstick survey as needing repair may be as small as an area bounded by column lines and half-column lines. 
Suspect areas identified by the initial ASTM E 1155 measurement are usually re-measured in more detail to establish the boundaries of the repair. 

31. What is a Superflat Floor? 

By definition, Superflat = Fmin 100  

The word Superflat was first used by The Face Companies in the 1970′s to describe the flatness/levelness required to support full-speed, trouble-free operation of Very Narrow Aisle (VNA) lift trucks. 

Since Fmin is the Defined Traffic F-Number, it cannot be measured using the ACI/CSA/ASTM F-Number System. 

In order to achieve this high degree of flatness/levelness, Superflat floors must be placed in long, narrow strips. The forms for Superflat placements must be set with great precision. Specialized finishing techniques and continuous quality control measurement are also required. The services of a floor design/construction consultant are usually advisable. 

For Random Traffic Floors, Superflat is often defined as FF 100/FL 50; but Superflat tolerances are rarely required on Random Traffic Floors and should be specified only in extraordinary circumstances. 

32. How is a Defined Traffic Superflat Floor measured? 

Floor consultants from The Face Companies measure Fmin using the Profileograph, in conjunction with their overall design, construction and certification services. 
For Random Traffic Floors, F-Numbers can be measured using the Dipstick Floor Profiler – but, again, the Dipstick should never be used to measure narrow aisle warehouse floors or any Defined Traffic Floor.  

33. Isn’t a Random Traffic Superflat Floor the same thing as a Defined Traffic Superflat Floor? 
  
No.  Defined Traffic Floor (such as a narrow aisle warehouse) supports traffic which moves along the exact same tracks all the time. 
This means that the travel paths can be measured using an instrument that precisely simulates the behavior of the vehicles which will be used on the floor. This kind of vehicle simulator (such as the Face Floor Profileograph) is configured to mimic the wheel pattern of the actual lift truck to be used. The instrument rolls down the vehicle travel paths and records the relative motion of its wheels, side to side and front to front. 
With this kind of continuous simulation measurement, local defects (bumps or dips) in the tracks can be identified and corrected by localized grinding. 
In contrast, ACI/CSA/ASTM F-Numbers (Random Traffic F-Numbers) are not measured from a continuous profile. The one-foot measurements do not simulate what the lift truck “sees” and cannot, therefore, be used to identify and repair specific wheel track defects. 

34. How much does a Superflat floor cost? 

The cost of making a floor Superflat varies significantly from one region of the country to another. The premium on smaller projects (25,000 sq. ft. and under) is especially difficult to generalize. 
But on average, turning a conventional floor into a Superflat floor (all other things being equal ) will likely increase the floor’s cost between $ 0.90 and $ 1.50 per square foot. 
Most of the extra costs are related to the additional labor required for special forming and finishing procedures, and the reduced production rates achieved (4,000 to 6,000 sq.ft./day per crew on the average). 

35. I can understand how grinding can be used to correct high spots on Superflat floors, but how can grinding fix low spots? 

If there is a spot that is too low in a Superflat Defined Traffic wheelpath, grinding can be used to smooth out the dip lengthwise down the track – and to lower the elevation of the opposite wheeltrack to level the location. 

36. Can a floor be Superflat even if it is designed to slope? 

Yes. Design slope can be compensated for in Superflat measurements. 

It’s important to remember that the floor profile characteristics that are critical to efficient, full-speed vehicle operation are the flatness/levelness characteristics under the wheels of the vehicle. 

In most cases, the truck really doesn’t care if one end of the aisle is higher or lower than the other. It only cares how many bumps and dips it encounters in getting from one end to the other. 

37. Can’t I save money by making my floor Superflat only in the travel paths and not under the racks? 

This is not a good idea in most cases. 

Remember, Superflat floors are placed in long, narrow strips. The strips are arranged to conform to the racking layout for the warehouse. The long edges of each strip are positioned so they will end up in the middle of adjacent racking sections. The aisleway and the travel path are located down the middle of each strip. 

Since forming the aisleway separately would require twice as much forming and twice as many slab placements, this approach is usually not practical – nor does it produce significantly better F-Numbers. 

The floor specification should include a per-square-foot figure for the portion of the floor that does not meet the Overall F-Numbers. 

38. Can a floor be built so it’s Superflat in all directions Ñ so I could move my racks in the future without worrying about floor flatness? 

No one has figured out a way to build a Superflat joint, so building a floor that’s Superflat in all directions is not yet possible. 
Using the best installation technologies available, the practical limit in as-built omni-directional flatness/levelness is about FF 50 / FL35. 

39. How can I make an existing conventional floor Superflat? 

There are two alternatives: 

        1)     a Superflat topping; or 
        2)     Superflat grinding. 

Both options require specialized knowledge, both in planning and executing the repair. 
The services of an floor consultant experienced in topping and grinding repairs should be retained early in the decision-making process. 

40. How do I get more information on F-Numbers and floor flatness/levelness? 
 

E-Mail us with your questions

Posted in Uncategorized | Leave a comment

Full-Track® power trowels will get your floors done fast!

Full -Track®

We’ll put you right on track!!!


Ø Cage

Inches

Ø Work

Inches

Weight

Lbs

Engine

HP

Ø Cage

CM

Ø Work

CM

Weight

KG

Floating

Blades

Combo

Blades

Finish

Blades

FT-432

34.4

32

176

6.5

88

80

80

FT-436

38.4

36

196

6.5

98

90

89

FT-448

50.4

48

242

9.0

128

120

110

Posted in Uncategorized | Leave a comment

A CONCRETE POLISHING MACHINE WITH FUTURE

FULL-TRACK

 

A CONCRETE POLISHING MACHINE WITH FUTURE

 

 

 

Specifications :

    

Type 

Ø Cage

Ø Work

Engine

Weight

Floating

Combo

Finish

FT432 

86 Cm 

80 Cm 

6.5 PK 

80 Kg

 

 

 

FT436 

96 Cm 

90 Cm 

6.5 PK 

89 Kg

 

 

 

FT448 

126 Cm 

120 Cm 

9 Pk 

110 Kg

 

 

 

 

Blades

  • The blades at traditional machines are attached with two bolts which are screwed by two holes in the arm. This affirmative method can cause serious injuries to, hands and fingers during unscrewing these bolts.
  • FULL-TRACK machines use one bolt on the head of the arm. This manner avoids injuring during exchanging the blades. The user must no longer with his hands and fingers between the security ring and the sharp plates when exchange these.

Spider Arms

  • Generally the spider arms are 2/3 of the additional plate length, after some times have been used, the crossing part of the blades and arms will bend as a result of which they can be exploited no longer up to.. This translates itself in a loss of 10% work suggesting area.
  • A FULL-TRACK arm has almost the same length as the blades, declines because of this it has been excluded and the guaranteed work suggesting area continues preserve.
  • Traditional polishing machines have equipped with centric twisted arms, they will move independently.
  • FULL-TRACK arms has been eccentrically twisted, independent moving has been excluded because of this. The four arms will always move simultaneously as a result of which small disparities are removed and the flatness of the floor will be increased. All spiders and arms have been blackened; oxidizing and being stuck of the arms inside the spider are avoided because of this subject to minimum to maintenance. After years of use the tolerance of the arm in the spider remains as it were nihilist. The work suggesting area remains thus be unchanged.


 

 

 

 

  • The security cage answers entirely to the CE standards.

 

Gearbox

  • FULL-TRACK gearbox castes are manufactured from high-quality aluminum. The layering has been calculated on all possible strengths and frictions as a result of which early wear is avoided. At possible internal damages breakdown services can be carried out with minimum to operations. The remuneration costs will diminish strongly because of this.

 


 

 

 

 

 

Engine

  • Perfectly calculated engine ensures sufficient strength.

 

Clutches

  • Traditional machines have equipped with a centrifugal clutch on the engine and an oar disk on the gearbox.
  • FULL-TRACK machines are equipped with a variable speed clutch on the engine and on the gearbox. These links ensure that both a very low and high RPM can be created without strength loss. Depending on the speed lower or higher variable clutches participate as a result of which the engine must no longer give strength than necessary is. A normal RPM amounts to 125 rpm, FULL-TRACK machines are adjusted on 200 rpm. This speed leaves finishing the floor more rapidly as a result of which saves the entrepreneur time and money.

 

 


 

 

 

    


 

 

 

 

 

Handle

  • FULL-TRACK machines standard are equipped with a trap less variable handle in altitude. Both large and the smaller user can work unforced because of this.

 

FULL-TRACK FINISHING MACHINES OFFERS ONLY ADVANTAGES. MORE SECURITY AND USER-FRIENDLY FOR THE USER AND FLATTER FLOORS DURING THIS RESULT YOU WILL HAVE MORE SATISFIED CUSTOMERS.

FRIENDLY MAINTANACE AND EASILY TO COMPOSE OR REPAIR.

 

 

 

Posted in Uncategorized | Leave a comment

Tips for Operating a Full-Track Power Trowel Safely

Tips for Operating a Full-Track Power Trowel Safely

Heed the following tips to help ensure that you safely operate your purchased Full-Track power trowel. Your affiliated dealer store professional also can instruct you on the proper operation of your purchased Full-Track power trowel.

Safety tips

·         Read all manufacturer warnings and instructions prior to using your Full-Track power trowel.

·         Follow safe lifting practices when loading and unloading Full-Track power trowel.

·         Properly secure Full-Track power trowel when you transport it.

·         Wear appropriate personal protective equipment (PPE), such as a dust mask or respirator, safety glasses, hearing protection and protective boots.

·         Never wear loose clothing or jewelry that can catch on the Full-Track power trowel during use.

·         Connect, electric power trowel to a grounded outlet only.

·         Only operate Full-Track, gas-powered power trowels in a well-ventilated area.

·         Ensure feet stay clear of the Full-Track power trowel’s path during operation.

·         Do not put hands or feet between rings when using the Full-Track power trowel.

·         Keep onlookers at an appropriate distance from the worksite.

·         Do not allow anyone to use, other than the operator, on Full-Track power trowels.

Usage tips

·         Purchase the appropriate Full-Track power trowel from your local affiliated dealer store. See Full-Track Power Trowel Options and Full-Track Features on Power Trowels for more information.

·         Check and, if needed, service fluid levels in Full-Track, gas-powered power trowels before use.

·         Select a blade — approved by the manufacturer of the Full-Track power trowel — that suits your intended application. Make sure to secure it to the Full-Track power trowel and adjust it properly. Position the trowel blades horizontally when performing floating operations and at a slight tilt for finishing operations.

·         Follow Full-Track recommendations for starting and shutting off the Full-Track power trowel.

·         Use the Full-Track power trowel for floating when the concrete has cured enough that the equipment operator barely leaves an impression when standing on the surface. Move a Full-Track walk-behind power trowel backwards when floating to level any footprints made by the operator.

·         Use the Full-Track power trowel for finishing when the concrete nearly has cured.

·         After finishing, roughen the surface a bit if you desire a non-skid surface.

·         Be sure to clean the Full-Track power trowel before using it again on the next job.

Contact your local, affiliated, dealer store for information on available Full-Track products and services to meet your power trowel needs. To locate the dealer store nearest you, use the contact us Locator.